Bridlington Project

  • Project:
    Bridlington Long Sea Outfall
  • Client:
    Yorkshire Water
  • Contractor:
    ABCO Marine
  • Sector:
    Marine

In the summer of 2013 Yorkshire Water constructed a new outfall at the SouthBeach in Bridlington.

Ardmore Precast supplied 335no ballast collars to suit a 2000mm OD pipe. Each pair of collars weighed approximately 12T.

Production took place at our facility at Lisahally, and transported to FoylePort for onward shipping to site.

55no pipe kennels were also manufactured for this scheme, each weighing 13.35T.

Ardmore provided technical advice on the design of the finished collars and final concrete mix design.